A second opinion for a building with a total area of 9,000 square meters and a solution that significantly shortened the execution time
The challenge:
A project of construction of a building with 3 classroom wings of three floors each, with a total area of 9,000 square meters.
The foundation solution given by the previous consultant included bentonite piles, the execution of which involves a high cost and a slow execution time.
The solution:
Using short piles that were drilled dry above the groundwater, at a significantly lower cost and a much shorter execution time.