Construction of an underground barrier on a huge scale and in varying soil types

The challenge:

A very large project required the division of work into different centers and subcontractors.

Adaptation of execution methods and equipment was required for the large scale project.

Dealing with various malfunctions and surprises during the execution (for example - escape of bentonite, severe segregation in concrete, etc.).

The solution:

Conducting a field investigation along the entire strip, to examine the different types of soil.

Frequent arrival to the field to examine problems and execution constraints that require adaptation and unique solutions.