top of page
Haifa Chemicals South - industrial buildings and facilities
Carrying out several construction and repair projects on the factory premises
The challenge:
A plant that includes many and varied construction elements in a variable soil section (sand/clay/lime bundles) and a very aggressive environment (chemicals) that damages the concrete.
Repairing buildings and elements damaged by aggressiveness and damage to the ground.
The solution:
Collecting all the results of the field investigation from all over the plant enabled the use of existing knowledge and the reduction of field investigations in new projects.
Adjusting the foundation solutions and performing aggressive soil tests in the various areas.
bottom of page