Commercial & office building in Hadera industrial area
A second opinion for the logistic center on an area of 11 dunams, which saved the developer millions of shekels and shortened the execution time.
The challenge:
Soil conditions on the site were challenging. The upper layer of soil is filled with sandy loam, and beneath it is a thick clay loam.
Groundwater appears at a depth of 3.0 m.
The previous soil consultant of the project gave a solution of large and deep piles, a design that will make the project significantly more expensive.
The solution:
Replacing the foundation method with the CMC method, making a network of concrete pillars without grouting to harden the soil layer.
The network was performed using several CFA machines that worked on site. Finally a barge was cast on the hardened ground.