Selected projects

אינג' יוגר מהנדסי קרקע וביסוס

Ha'Imahot st. Tiberias

The construction of Ha'Imahot Street road in the problematic marlstone area 

אינג' יוגר מהנדסי קרקע וביסוס

Hadera mall

A second opinion for the establishment of an open mall structure near the beach road and providing an alternative solution

אינג' יוגר מהנדסי קרקע וביסוס

Etz Efraim house

A second opinion for the project of a house above about 10-14 m of uncontrolled fill, and a solution that financially enabled the execution of the project.

אינג' יוגר מהנדסי קרקע וביסוס

Residential complex in Arsuf

A luxury residential complex

at the top

of the coastal cliff

in Arsuf

אינג' יוגר מהנדסי קרקע וביסוס

TMA 38/1 Osishkin st. Tel Aviv

An existing structure

based on slabs

on thick clay

near the

groundwater level

אינג' יוגר מהנדסי קרקע וביסוס

Industrial building in Har-Tuv

A second opinion that led to a change in the execution method in two supported walls and saved a lot of time in the execution 

אינג' יוגר מהנדסי קרקע וביסוס

El Matan neighborhood, Ma'ale Shomron

Second opinion, providing a solution of adapting the foundation to the findings while performing and reducing about 60% of the pile volume which resulted in significant savings in construction costs.

אינג' יוגר מהנדסי קרקע וביסוס

Beit Shemesh neighbourhoods

Development of several neighborhoods in Beit Shemesh on complex and problematic soil

אינג' יוגר מהנדסי קרקע וביסוס

Open University in Ra'anana

The foundation of the university structure, which includes upper and underground parts

in complex soil

אינג' יוגר מהנדסי קרקע וביסוס

Ramat Hasharon house

A second opinion for the project of a detached building on spillway land that resulted in savings of hundreds of thousands of shekels in the execution method.

אינג' יוגר מהנדסי קרקע וביסוס

Kfar Saba construction project

Providing a second opinion for a residential building and providing a solution for the successful completion of the construction

אינג' יוגר מהנדסי קרקע וביסוס

TMA 38/1 Fayvel st. Tel Aviv

Project TMA 38/1 (strengthening of a residential building and adding floors) which included hanging a building for the purpose of digging under it.

אינג' יוגר מהנדסי קרקע וביסוס

Haifa Chemicals South - industrial buildings and facilities

Carrying out several construction and repair projects on the factory 

אינג' יוגר מהנדסי קרקע וביסוס

Trio Towers Netanya

Foundation of  three 26-floor residential towers using an innovative method 

אינג' יוגר מהנדסי קרקע וביסוס

Hofim school Hadera

A second opinion for a building with a total area of 9,000 square meters and a solution that significantly shortened the execution time

אינג' יוגר מהנדסי קרקע וביסוס

Kfar Shmaryahu house

Construction of a luxury villa that includes glass facades

and varying levels in the area where there was

an existing building.

אינג' יוגר מהנדסי קרקע וביסוס

A residential building in Mevaseret Zion

Second opinion and an economic solution for establishing 2 buildings with 9 floors & 2 basement floors 

אינג' יוגר מהנדסי קרקע וביסוס

Underground parking lot, Sha'are Zedek, Jerusalem

A foundation solution for the parking lot that includes monitoring the implementation 

אינג' יוגר מהנדסי קרקע וביסוס

Nesher Ramla

Carrying out

a variety of projects

on the territory

of the cement plant.